required during the implementation phase to review the systems
contractor’s submittals, to check pre-installation and on-site
workmanship and progress, and to supervise the acceptance testing of all
systems.
Review with systems contractor and the client to
establish scheduling, operating, and reporting procedures for
implementation.
Review and approve the systems contractor’s shop
drawings for conformance with the specifications and contract
documents.
Review and approve workmanship and progress of the
systems contractor during fabrication at his shop.
Conduct site visits during systems installation to
verify workmanship and conformance to specifications.
Supervise and approve on-site acceptance testing of
all equipment and systems operation.